ジンバブエ鉱業向け 실제 구매 사례: Bindura Nickel Corporation 확장 프로젝트를 위해中国からハラルへ供給された156トンのGrade 8.8六角ボルトとアンカーボルト。
プロジェクト背景:ジンバブエ鉱業装置の標準化
Content coming soon.
締結具仕様:鉱業装置向けBS規格
Content coming soon.
| Product | Standard | Quantity | Unit Price (USD) | Total (USD) |
|---|---|---|---|---|
| Hex bolts M16x50mm BS 3692 Grade 8.8 | BS 3692 | 48,000 pcs | $0.58/pc | $27,840 |
| Hex bolts M20x65mm BS 3692 Grade 8.8 | BS 3692 | 36,000 pcs | $0.82/pc | $29,520 |
| Hex bolts M24x80mm BS 3692 Grade 8.8 | BS 3692 | 24,000 pcs | $1.28/pc | $30,720 |
| Anchor bolts M20x250mm BS 3692 Grade 4.6 | BS 3692 | 12,000 pcs | $1.85/pc | $22,200 |
| Coach screws M10x75mm hot-dip galvanized | BS 4570 | 60,000 pcs | $0.18/pc | $10,800 |
| Washers M16 flat HDG | BS 4320 | 96,000 pcs | $0.06/pc | $5,760 |
| Nuts M16 Grade 8 HDG | BS 3692 | 48,000 pcs | $0.12/pc | $5,760 |
| **TOTAL** | - | **156 tonnes** | - | **$132,600** |
物流:中国からベイラを経てハラルへのサプライチェーン
Content coming soon.
支払いとRBZコンプライアンス文書
Content coming soon.
プロジェクト成果:12ヶ月で100%定時配送
Content coming soon.
ジンバブエのプロジェクト向けのCIFベイラ価格を取得
Content coming soon.
Frequently Asked Questions
See frequently asked questions below.
What is the typical lead time for fasteners to Zimbabwe?
From China to Zimbabwe via Beira port (Mozambique): 25-35 days sea freight. Durban (South Africa): 30-40 days. Air freight is available for urgent orders (5-7 days) but costs 5-8x more. For construction projects, order 60-90 days before needed date to account for production (15-25 days) and shipping.
What import duties apply to fasteners entering Zimbabwe?
Fasteners typically fall under HS Code 7318 (Screws, bolts, nuts, coach screws, etc.). Import duty is approximately 40% + 15% VAT on CIF value. Surcharges may apply. Zimbabwe also requires a Valid Import Declaration Number (IDN) from the Zimbabwe Revenue Authority (ZIMRA). Working with an experienced customs broker is essential.
Which Zimbabwe industries have the highest demand for fasteners?
Mining is the largest fastener consumer in Zimbabwe, particularly platinum, gold, and nickel mining operations. Construction (commercial and residential), agriculture (irrigation systems), and water infrastructure projects also drive significant demand. The energy sector (Hwange thermal power station upgrades) and telecommunications tower expansion are emerging growth areas.
ジンバブエの鉱業または建設に締結具が必要ですか?
ジンバブエの見積もりを依頼