| Product | Standard | Quantity | Unit Price (USD) | Total (USD) |
|---|---|---|---|---|
| Hex bolts M16x50mm BS 3692 Grade 8.8 | BS 3692 | 48,000 pcs | $0.58/pc | $27,840 |
| Hex bolts M20x65mm BS 3692 Grade 8.8 | BS 3692 | 36,000 pcs | $0.82/pc | $29,520 |
| Hex bolts M24x80mm BS 3692 Grade 8.8 | BS 3692 | 24,000 pcs | $1.28/pc | $30,720 |
| Anchor bolts M20x250mm BS 3692 Grade 4.6 | BS 3692 | 12,000 pcs | $1.85/pc | $22,200 |
| Coach screws M10x75mm hot-dip galvanized | BS 4570 | 60,000 pcs | $0.18/pc | $10,800 |
| Washers M16 flat HDG | BS 4320 | 96,000 pcs | $0.06/pc | $5,760 |
| Nuts M16 Grade 8 HDG | BS 3692 | 48,000 pcs | $0.12/pc | $5,760 |
| **TOTAL** | - | **156 tonnes** | - | **$132,600** |
Логистика: Цепь поставок из Китая в Бейру в Хараре
Content coming soon.
Оплата и документация соответствия RBZ
Content coming soon.
Результаты проекта: 100% доставка вовремя за 12 месяцев
Content coming soon.
Получите цены CIF Бейра для вашего проекта в Зимбабве
Content coming soon.
Frequently Asked Questions
See frequently asked questions below.
What is the typical lead time for fasteners to Zimbabwe?
From China to Zimbabwe via Beira port (Mozambique): 25-35 days sea freight. Durban (South Africa): 30-40 days. Air freight is available for urgent orders (5-7 days) but costs 5-8x more. For construction projects, order 60-90 days before needed date to account for production (15-25 days) and shipping.
What import duties apply to fasteners entering Zimbabwe?
Fasteners typically fall under HS Code 7318 (Screws, bolts, nuts, coach screws, etc.). Import duty is approximately 40% + 15% VAT on CIF value. Surcharges may apply. Zimbabwe also requires a Valid Import Declaration Number (IDN) from the Zimbabwe Revenue Authority (ZIMRA). Working with an experienced customs broker is essential.
Which Zimbabwe industries have the highest demand for fasteners?
Mining is the largest fastener consumer in Zimbabwe, particularly platinum, gold, and nickel mining operations. Construction (commercial and residential), agriculture (irrigation systems), and water infrastructure projects also drive significant demand. The energy sector (Hwange thermal power station upgrades) and telecommunications tower expansion are emerging growth areas.