津巴布韦紧固件市场案例研究:Bindura镍矿扩建项目
返回文章列表Case Study

津巴布韦紧固件市场案例研究:Bindura镍矿扩建项目

2026-06-02· ~10 min read

津巴布韦矿业真实采购案例:为Bindura镍业公司扩建项目从中国供应156吨8.8级六角螺栓和锚栓到哈拉雷。包括 CIF 贝拉港价格和 RBZ 文件。

Share:

项目背景:津巴布韦采矿设备标准化

Content coming soon.

紧固件规格:采矿设备的BS标准

Content coming soon.

ProductStandardQuantityUnit Price (USD)Total (USD)
Hex bolts M16x50mm BS 3692 Grade 8.8BS 369248,000 pcs$0.58/pc$27,840
Hex bolts M20x65mm BS 3692 Grade 8.8BS 369236,000 pcs$0.82/pc$29,520
Hex bolts M24x80mm BS 3692 Grade 8.8BS 369224,000 pcs$1.28/pc$30,720
Anchor bolts M20x250mm BS 3692 Grade 4.6BS 369212,000 pcs$1.85/pc$22,200
Coach screws M10x75mm hot-dip galvanizedBS 457060,000 pcs$0.18/pc$10,800
Washers M16 flat HDGBS 432096,000 pcs$0.06/pc$5,760
Nuts M16 Grade 8 HDGBS 369248,000 pcs$0.12/pc$5,760
**TOTAL**-**156 tonnes**-**$132,600**

物流:中国到贝拉港到哈拉雷的供应链

Content coming soon.

付款和RBZ合规文件

Content coming soon.

项目成果:12个月内100%准时交付

Content coming soon.

获取您的津巴布韦项目的 CIF 贝拉港报价

Content coming soon.

Frequently Asked Questions

See frequently asked questions below.

What is the typical lead time for fasteners to Zimbabwe?

From China to Zimbabwe via Beira port (Mozambique): 25-35 days sea freight. Durban (South Africa): 30-40 days. Air freight is available for urgent orders (5-7 days) but costs 5-8x more. For construction projects, order 60-90 days before needed date to account for production (15-25 days) and shipping.

What import duties apply to fasteners entering Zimbabwe?

Fasteners typically fall under HS Code 7318 (Screws, bolts, nuts, coach screws, etc.). Import duty is approximately 40% + 15% VAT on CIF value. Surcharges may apply. Zimbabwe also requires a Valid Import Declaration Number (IDN) from the Zimbabwe Revenue Authority (ZIMRA). Working with an experienced customs broker is essential.

Which Zimbabwe industries have the highest demand for fasteners?

Mining is the largest fastener consumer in Zimbabwe, particularly platinum, gold, and nickel mining operations. Construction (commercial and residential), agriculture (irrigation systems), and water infrastructure projects also drive significant demand. The energy sector (Hwange thermal power station upgrades) and telecommunications tower expansion are emerging growth areas.