Echte Beschaffungsfallstudie für Simbabwes Bergbausektor: 156 Tonnen Grade 8.8 Sechskantbolzen und Ankerbolzen aus China nach Harare für Bindura Nickel Corporation Erweiterung.
Projektkontext: Simbabwe Bergbauausrüstung Standardisierung
Content coming soon.
Befestigungsspezifikationen: BS Standards für Bergbauausrüstung
Content coming soon.
| Product | Standard | Quantity | Unit Price (USD) | Total (USD) |
|---|---|---|---|---|
| Hex bolts M16x50mm BS 3692 Grade 8.8 | BS 3692 | 48,000 pcs | $0.58/pc | $27,840 |
| Hex bolts M20x65mm BS 3692 Grade 8.8 | BS 3692 | 36,000 pcs | $0.82/pc | $29,520 |
| Hex bolts M24x80mm BS 3692 Grade 8.8 | BS 3692 | 24,000 pcs | $1.28/pc | $30,720 |
| Anchor bolts M20x250mm BS 3692 Grade 4.6 | BS 3692 | 12,000 pcs | $1.85/pc | $22,200 |
| Coach screws M10x75mm hot-dip galvanized | BS 4570 | 60,000 pcs | $0.18/pc | $10,800 |
| Washers M16 flat HDG | BS 4320 | 96,000 pcs | $0.06/pc | $5,760 |
| Nuts M16 Grade 8 HDG | BS 3692 | 48,000 pcs | $0.12/pc | $5,760 |
| **TOTAL** | - | **156 tonnes** | - | **$132,600** |
Logistik: China nach Beira nach Harare Lieferkette
Content coming soon.
Zahlung und RBZ Compliance Dokumentation
Content coming soon.
Projektergebnisse: 100% Pünktliche Lieferung Über 12 Monate
Content coming soon.
Erhalten Sie CIF Beira Preise für Ihr Simbabwe Projekt
Content coming soon.
Frequently Asked Questions
See frequently asked questions below.
What is the typical lead time for fasteners to Zimbabwe?
From China to Zimbabwe via Beira port (Mozambique): 25-35 days sea freight. Durban (South Africa): 30-40 days. Air freight is available for urgent orders (5-7 days) but costs 5-8x more. For construction projects, order 60-90 days before needed date to account for production (15-25 days) and shipping.
What import duties apply to fasteners entering Zimbabwe?
Fasteners typically fall under HS Code 7318 (Screws, bolts, nuts, coach screws, etc.). Import duty is approximately 40% + 15% VAT on CIF value. Surcharges may apply. Zimbabwe also requires a Valid Import Declaration Number (IDN) from the Zimbabwe Revenue Authority (ZIMRA). Working with an experienced customs broker is essential.
Which Zimbabwe industries have the highest demand for fasteners?
Mining is the largest fastener consumer in Zimbabwe, particularly platinum, gold, and nickel mining operations. Construction (commercial and residential), agriculture (irrigation systems), and water infrastructure projects also drive significant demand. The energy sector (Hwange thermal power station upgrades) and telecommunications tower expansion are emerging growth areas.